#81862: "Contracts"
Mille kohta see veateade on?
Mis juhtus? Palun vali alt
Mis juhtus? Palun vali alt
Palun kontrolli, kas samal teemal on juba aruanne olemas
Kui jah, siis HÄÄLETAGE selle raporti poolt. Kõige rohkem hääli sisaldavatele aruannetele antakse PRIORITEET!
| # | Status | Votes | Game | Type | Title | Last update |
|---|
Detailne kirjeldus
-
• Kui näed ekraanil veateadet, kopeeri see siia.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Kirjelda, mida sa soovisid teha, mida sa tegid ja mis juhtus
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • mis on sinu veebilehitseja?
Google Chrome v109
-
• Palun kopeeri/kleebi kuvatud tekst inglise keeles, mitte sinu oma keeles. Kui sul on sellest veast ekraanipilt (hea tava), saad kasutada Imgur.com selle üleslaadimiseks ja lingi siia kopeerida.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Kas see tekst on kättesaadav tõlkesüsteemis ? Kui jah, kas see on tõlgitud rohkem kui 24 tundi tagasi?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • mis on sinu veebilehitseja?
Google Chrome v109
-
• Palun selgita oma ettepanekut täpselt ja lühidalt, et oleks võimalikult lihtne mõista, mida silmas pead.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). • mis on sinu veebilehitseja?
Google Chrome v109
-
• Mis oli ekraanil, kui sind blokeeriti? (Tühi ekraan? Osa mänguliidesest? Veateade?)
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). • mis on sinu veebilehitseja?
Google Chrome v109
-
• Millist osa BGA kohandamisest ei järgitud
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Kas reeglite rikkumist on mängu taasesitusel näha? Kui jah, siis mitmendal käigul?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • mis on sinu veebilehitseja?
Google Chrome v109
-
• Milline oli mängu tegevus, mida tahtsid sooritada?
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Mida püüdsid teha, et seda mängu tegevust käivitada?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). -
• Mis juhtus, kui seda proovisite (veateade, mängu olekuriba teade, ...)?
• mis on sinu veebilehitseja?
Google Chrome v109
-
• Millises mängu etapis esines probleem (Mis oli selle mänguetapi instruktsioon)?
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Mis juhtus, kui proovisite sooritada seda mängu käiku (veateade, mängu olekuriba sõnum, ...)?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • mis on sinu veebilehitseja?
Google Chrome v109
-
• Kirjelda kuvamise probleemi. Kui sul on sellest veast ekraanipilt (hea tava), saad kasutada Imgur.com selle üleslaadimiseks ja lingi siia kopeerida.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). • mis on sinu veebilehitseja?
Google Chrome v109
-
• Palun kopeeri/kleebi kuvatud tekst inglise keeles, mitte sinu oma keeles. Kui sul on sellest veast ekraanipilt (hea tava), saad kasutada Imgur.com selle üleslaadimiseks ja lingi siia kopeerida.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Kas see tekst on kättesaadav tõlkesüsteemis ? Kui jah, kas see on tõlgitud rohkem kui 24 tundi tagasi?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • mis on sinu veebilehitseja?
Google Chrome v109
-
• Palun selgita oma ettepanekut täpselt ja lühidalt, et oleks võimalikult lihtne mõista, mida silmas pead.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). • mis on sinu veebilehitseja?
Google Chrome v109
Aruande ajalugu
The elevation granted by the contract was automatically build because there was only one place available.
Contract rewards are not mandatory.
The conduit granted by the contract was automatically built.
When there isn't only one place available, there is an option to skip building the structure. It should always be an option.
Lisa midagi sellele raportile
- Teine laua ID / käigu ID
- Kas F5 lahendas probleemi?
- Kas probleem esines mitmel korral? Igal korral?
- Kui sul on sellest veast ekraanipilt (hea tava), saad kasutada Imgur.com selle üleslaadimiseks ja lingi siia kopeerida.
